← Back to feed

Two roadways will have total closures this Tuesday (14th) for construction work

2 sources · 14 Apr 2026

BR-101 in Anchieta will be closed at 2 PM for 20 minutes for rock blasting. Cristiano Machado Avenue in BH will be closed at 11 AM for 4 hours for new lane installation.

The road closures are part of ongoing infrastructure projects: BR-101 in Anchieta is undergoing duplication scheduled for completion by the end of 2026, while Avenida Cristiano Machado in BH has tunnel construction works requiring lane expansion to improve traffic flow.

Where they disagree: 4 partial reports See the disagreements →

What the sources say

Consensus
0
all sources agree
Partial
4
only one or two report
Disputed
0
sources contradict each other

Click any claim to see the source quotes and primary documents.

Unconfirmed exclusive
1 source · tap to expand

BR-101 will be closed at km 369.13 at 2 PM on Tuesday (14th) for about 20 minutes for controlled rock blasting

⚠ only one source — exclusive, unconfirmed

Reported by: A Gazeta
Silence from: O Tempo Regional
Unconfirmed exclusive
1 source · tap to expand

Cristiano Machado Avenue will be closed at 11 AM on Tuesday (14th) for about 4 hours for new lane installation

⚠ only one source — exclusive, unconfirmed

Reported by: O Tempo Regional
Silence from: A Gazeta
Unconfirmed exclusive
1 source · tap to expand

Controlled fragmentation technique will be used to move 120.25 m³ of rock material

⚠ only one source — exclusive, unconfirmed

Reported by: A Gazeta
Silence from: O Tempo Regional
Unconfirmed exclusive
1 source · tap to expand

BH construction work includes removal and reinstallation of power poles and roadway widening

⚠ only one source — exclusive, unconfirmed

Reported by: O Tempo Regional
Silence from: A Gazeta

All sources

Press 2